Doxiadis Associates  - Written For: Doxiadis Associates<br/><br/>Date: December 21, 1960<br/><br/>The document, reported to Doxiadis Associates, is in regard to a structure in Pakistan consisting of a constructed roof feature which, according to Fathy, was adequate and ideal for similar construction in other like regions having a hot and humid climate. The document also includes several photographs and plans from the Pakistani structure. Fathy proposes to adapt roof structure design to the  corrugated roof structure design from this building to avoid high costs of material and construction.  He asserts that the geometrical form of the construction should enable a stronger structure. Furthermore, Fathy discusses  the steps needed to be taken in order to achieve this method of roof construction.

Report To Doxiadis Associates: A Roof For Hot-Humid Zones

Type
report
Year
1960
Written For: Doxiadis Associates

Date: December 21, 1960

The document, reported to Doxiadis Associates, is in regard to a structure in Pakistan consisting of a constructed roof feature which, according to Fathy, was adequate and ideal for similar construction in other like regions having a hot and humid climate. The document also includes several photographs and plans from the Pakistani structure. Fathy proposes to adapt roof structure design to the corrugated roof structure design from this building to avoid high costs of material and construction. He asserts that the geometrical form of the construction should enable a stronger structure. Furthermore, Fathy discusses the steps needed to be taken in order to achieve this method of roof construction.

Citation

Fathy, Hassan. Report To Doxiadis Associates: A Roof For Hot-Humid Zones. 21 Dec. 1960. Hassan Fathy Archives. Aga Khan Trust for Culture. Geneva, Switzerland.

Authorities

Collections

Copyright

Aga Khan Trust for Culture

Terms of Use

Unknown

Country

Pakistan

Language

English

Keywords